What is the our production time ?

5 January 16 1,862K 1,862 180 8

Production Time.

The production time depends on the product type and quantity .

For Example;

YMT 1300 hygiene sanitation is our small hygiene machine. We need between 1 to 2 week for production.

Also HBT 2900 Hygiene Sanitation is our biggest machine and we need between 3 to 4 weeks for production.

For sink system ; We usually need 1 week to production time for ES-DK 50 , Besides; we need minimum 2 weeks to production time for ES-F 2100 Sink system.

So that;
Small order ; we need minimum between 1 to 2 week for production time , ,
Middle order ;we need minimum between 3 to 4 week for production time
Large order ; we need minimum between 4 to 6 week for production time.